Does an average divided by the total make sense?
Does the above metric make sense and can it be used to assess the productivity of the factory after you exclude the effect of its potato loading? Is dividing an average with the total number of units a valid metric to compare the average between days of various total numbers of units?
If you do not use this metric, you will say that the second day, the processing time of the factory was 1.2h/potato which is 0.2h/potato less than yesterday so you will be worried that the performance has dropped and there is an issue while in fact it can be a 'natural' drop of performance due to higher load and no other issue would exist.